Przeskocz do treści Przeskocz do menu

Cooperation with IM3

Kalendarz

Cooperation with IM3

We are happy to share the progress of our fruitful cooperation with IM3.

Our partner has implemented communication and synchronisation equipment to monitor the measurements of 34.5 kV circuits in the development of Enel Colombia's photovoltaic projects.

What does this implementation include?

  • The Quazar 100 GPS synchronisation system with support for time synchronisation protocols such as PTP, NTP/SNTP and SyncE.
  • Hyperion 105 and 306 industrial switches, designed to withstand extreme environmental conditions, are used to directly power the GPS system through the implementation of PoE technology.

The collaboration with IM3 marks the beginning of a strategic relationship that will drive technological solutions in the South American energy sector.

We are excited about the upcoming challenges and achievements we will achieve together!